1145 65th Avenue NE
Calgary, AB T2E 8T9
1998
27,819 sq. ft.
24 ft

Overview

The industrial property is located in Deerfoot Industrial Park. The park has direct access off the Deerfoot Trail via 64th Avenue and benefits from close proximity to the Calgary Airport. Completed in 1998, the building is constructed of pre-cast concrete panels on poured-in-place concrete grade beams supported by a pile system. Ceiling height is 24 feet.

Javascript is required to view this map.
Property Management
Chika Marko
BentallGreenOak (Canada) Ltd. Partnership
403.303.2418
Leasing and Asset Management
Alexis Johnston
Concert Realty Services Ltd.
604.602.3781